Читаем Critical Path полностью

Critical Path

Destroying the croatoan's seat of power has grave consequences.Earth is recovering after Denver and his group managed to stamp out the immediate alien threat. Now, Denver and his team, stationed in a liberated croatoan farm, plan to restore humanity as the dominant force. But when shocking information comes to light, they set off on an immediate mission north.Earth faces destruction, unless bitter enemies can work together.The team encounter a hybrid city, where humans and croatoans live and work together. It's here in this strange new civilisation that Denver discovers there's a bigger threat to the planet than the aliens already on the surface: something far more terrible is coming. It'll be a race against the clock to defeat this new threat and Denver will need all the help he can get.Critical Path is the exciting sequel to Critical Dawn.

Colin F. Barnes , Darren A. Wearmouth

Триллер / Научная Фантастика18+

CRITICAL PATH

by

Wearmouth & Barnes

CHAPTER ONE

Sacrifice isn’t the end of something; it’s the beginning. Denver knew this before his father, Charlie, gave up his life to bring down the two alien ships. But Denver wasn’t so naïve to believe that the work was done.

On the contrary, the real challenge was still ahead of them.

He wiped sweat from his brow. The salty liquid made his tanned forearm shine in the morning sun. It was no more than 0800. Charlie had taught him how to tell the time from the sun’s position when he was just a child. Over the years, he’d built up an almost unnatural ability to know it instinctively, analyzing the length and direction of shadows.

He stood in a dappled clearing five kilometers north of their new base—Freetown, a repurposed croatoan farm that remained inactivated due to it being farther north than their terraforming operation. The shadows from the crumbled remnants of a wooden hunting shack covered the damp, loamy ground.

Mildew glistened like a silver mist across the tips of the long grass. The place had a fresh scent to it. Since they destroyed most of the root growth, the orange tint to the atmosphere became less visible.

Earth seemed to be healing itself, returning to normal.

Wildlife grew in number—rabbits, squirrels, deer, and varied birds were now more visible and less sickly than before. Despite that, Denver knew it would take years for the damage of the root to the ecosystem to be fully repaired.

The cold dampness seeped into the fabric toes of his boots where the gaffer tape covering had come away during the trek. Thorns had snagged at his boots and jeans as he, Layla, and their new friend, Khan, parked their appropriated hover-bikes and descended on foot further into the woods in search of a downed escape pod.

Layla stood five yards in front of him.

She wore the now-familiar farm outfit: a form-fitting gray and blue cotton one-piece with a zip running at an angle from her right shoulder to her left hip. Her shadow stretched westward, covering a dark, scorched section of earth.

A cool breeze made her ponytail sway and the small hairs on the back of her slender neck shimmer. Despite her real age being somewhere in the fifties, she looked no older than mid-thirties, the root consumption keeping her young, as it did Gregor and Charlie.

Layla lowered to her haunches and inspected the scar in the earth, created by a fallen escape pod.

The scar cut a ridge into the ground some three meters wide and over a dozen long. The interesting feature, however, wasn’t the scar; it was the complete lack of pod. Someone, or something, had taken it away.

While they waited on Khan, a young tracker who had made his home in Freetown before they had re-established it as a base, Denver couldn’t help but think about Layla.

Being at a crash site of one of the pods wasn’t enough to distract his thoughts away from her completely as she made notes on a tablet device—a leftover piece of equipment they had learned to work and reprogram for their own uses.

The aliens on the various farms abandoned their duties and their influence over the human population shortly after the ships crashed to Earth. Denver suspected that when the pods landed they must have sent out a signal across the croatoans’ network.

Within days the aliens left the farms in a great migration to the north.

Since that time, Layla had led a diplomatic program of integration, bringing dozens of farms together, working towards one goal: reuniting humanity into a force that could not only defend themselves and live freely, but also thrive.

From the south, the croatoans still held a great number of farms, and the humans from the northern facilities would often have to defend against them.

The aliens were losing, however, their attacks coming less frequently.

The ‘cattle’ were educated and trained. The men and women subjugated by Augustus and the croatoan council to run the farms were now setting up communications and developing real farms, growing vegetables and more importantly—destroying the vast tracks of root so that the ground wouldn’t be poisoned any longer.

Where Gregor tried to use aggression and intimidation to reunite the various workers, Layla’s use of empathy and understanding brought quicker results.

She’d become their de facto leader almost by accident. Something that didn’t sit well with Gregor, but then he always was an instigator.

“It can’t be far,” Layla said, turning to face him. The golden light of morning reflected off her face, making her eyes glint.

Denver caught himself staring and looked away before casually glancing back as though he too was inspecting the crash site. “Khan’s a good tracker. I’m sure we’ll find it.”

“The implication of it being moved probably suggests that who or whatever was inside is now out in the open.”

Перейти на страницу:

Похожие книги

Ледовый барьер
Ледовый барьер

«…Отчасти на написание "Ледового Барьера" нас вдохновила научная экспедиция, которая имела место в действительности. В 1906-м году адмирал Роберт Е. Пири нашёл в северной части Гренландии самый крупный метеорит в мире, которому дал имя Анигито. Адмирал сумел определить его местонахождение, поскольку эскимосы той области пользовались железными наконечниками для копий холодной ковки, в которых Пири на основании анализа узнал материал метеорита. В конце концов он достал Анигито, с невероятными трудностями погрузив его на корабль. Оказавшаяся на борту масса железа сбила на корабле все компасы. Тем не менее, Пири сумел доставить его в американский Музей естественной истории в Нью-Йорке, где тот до сих пор выставлен в Зале метеоритов. Адмирал подробно изложил эту историю в своей книге "На север по Большому Льду". "Никогда я не получал такого ясного представления о силе гравитации до того, как мне пришлось иметь дело с этой горой железа", — отмечал Пири. Анигито настолько тяжёл, что покоится на шести массивных стальных колоннах, которые пронизывают пол выставочного зала метеоритов, проходят через фундамент и встроены в само скальное основание под зданием музея.

Дуглас Престон , Линкольн Чайлд , Линкольн Чайльд

Детективы / Триллер / Триллеры
Ноль-Ноль
Ноль-Ноль

В сетевые и ролевые игры играют студенты и менеджеры, врачи и школьники, фотомодели и драгдилеры, писатели и читатели… притворяясь эльфами, инопланетянами, супергероями. Жестокими и бессмертными.В плену иллюзий жизнь становится космической одиссеей безумцев. Они тратят последние деньги, они бросают семьи и работу, они готовы практически на все, чтобы игра продолжалась.…Когда всемогущий Инвар Мос пошлет тебе sms, твое время начнет обратный отсчет. И останется только выбрать — охотник ты или жертва. Догонять или убегать. Или прекратить игру единственным возможным способом — самоубийством.Мы испытываем тревогу, забыв дома мобильник. Начинаем неуверенно ориентироваться в пространстве. На расстоянии нескольких метров ищем друг друга по Bluetooth! Игро- и гэджетмания принимают характер эпидемии во всем мире. Уже появились клиники по лечению игрорасстройств! Каждый должен отвечать за те «реальности», которые создал. Как и в обычной жизни, от выбора зависят судьбы близких!Яркий образный язык романа-предостережения Алексея Евдокимова точно отражает «клиповое» сознание современного человека.

Алексей Геннадьевич Евдокимов , Алексей Евдокимов , Юлий Арутюнян

Детективы / Триллер / Триллеры